Before and After Master Bedroom

Repairing Cracks, Fall 2008

Skim coat, and priming Dec 2008

Jan 2009 Valspar "Mossy" for walls to match fabric for draperies. Crown molding to be added last . . . we'll do all the upstairs crown molding as one project in the future. We'll repaint floors someday.

June 2008 My sister made draperies.

My sister's secret to puddling drapes . . . add cotton piping at hem. Just a tiny fluff of the material and they puddled perfectly.

Jan 2009 I covered lamp shade to match drapes

Oct 2008 Repairing cracks in Downstairs Bedroom #1

Downstairs Bedroom #1. Repaired Cracks, Skim coat, priming. Valspar "Bewitch" (same color as bathroom beadboard)

Downstairs Bedroom #1 showing pocket doors

Air conditioned Downstairs Bedroom #1