floor joists which include hand sawed beams and victorian 2x6 dimensional lumber and replace it all with modern 2x8 or 2x10
joists 12 or maybe 16 inches on center in order to level the floor and provide the proper support as my joists are about 19 inches on center. I had a contractor tell me yesterday that he wouldnt remove the original joists but would sister new 2x8s or
2x10s to the existing dimensional lumber and shim the top of the hand sawed tree trunk beams to provide additional support
and level the floor. Any one had this problem on OHW and what did you do, how successful was it?